Testing the function of the WWTP during a long-term shutdown and subsequent commissioning
Based on the requirement to verify the possibility of the WWTP function during a long-term shutdown, especially for recreationally inhabited objects with a long seasonal break, we tested the wastewater treatment plant for these modified operating conditions.
Without electricity, in the heart of the Alps: We are completing the installation of a wastewater treatment plant for the Tribulaunhütte mountain hut (2,064 m above sea level)
We have completed the installation of a passive standard wastewater treatment plant for the Tribulaunhütte mountain hut in South Tyrol. Even at an altitude of 2,064 meters above sea level, we managed to install a technologically advanced WWTP without the need for electricity or a helicopter.
What is the lifetime of the treatment plant?
And how long will the purifier last?