DEPO CLEAN [en]
…
…
From miniature-scale work in the workshop to installation at an elevation of 1,740 meters above sea level.
Learn more …
5. 8. 2026
Based on the requirement to verify the possibility of the WWTP function during a long-term shutdown, especially for recreationally inhabited objects with a long seasonal break, we tested the wastewater treatment plant for these modified operating conditions.
Learn more …
15. 4. 2026
And how long will the purifier last?
Learn more …
24. 7. 2025